Some environmental agencies and air permits require accurate documentation of oxidizer service and maintenance records as well as having the necessary spare parts on hand.

S&SE can consult and provide a checklist of recommended spare parts with most oxidizer systems on the market. As a valued aftermarket service we also have trained technicians available on-site to troubleshoot potential failures and recommend the necessary part or spare parts to make repairs as quickly as possible and prevent costly downtime.

S&SE recommended critical spare parts to prevent
down time and meet compliance regulations.

  • Please call and speak with an S&SE on site trained technician to identify the right parts for your make and model of oxidizer.
  • You can also download the spare parts order form to the right for reference  ordering.

QUANTITY

DESCRIPTION
1Flame Safeguard
1UV Scanner
1 PackChart Recorder Paper
1Power Supply (24V)
1Motor Starter/Contactor

(Combustion Blower/5 HP)

3SPDT Relays
1DPDT Relays
1Master Control Relay
1Indicator Switch

( Gas Solenoid Closed Position)

1High Gas Pressure Switch
1Burner Spark Plug
1Actuator Motor (Mod. Motor 4-20 mA)
1Air Pressure Switch ( Main Blower)
1Air Pressure Switch ( Combustion Blower)
3Thermocouple element (INCONEL) 36”
2Thermocouple element 24”
1Proximity Sensor
2Reed Switch
1Particulate Filter (Compressed Air)
1Filter (Regulator)
1Inline Compressed Air Filter Element
1Solenoid Valve (Main Valve)
1Solenoid Valve
2Speed Control Muffler/Silencer (Air Cylinder)
2Quick Relief Valve (Air Cylinder)
1Pneumatic Cylinder
1 BOXPanel Lamps
4Seal for Poppet Valve
3 TubesHigh Temp Silicone Sealant

(Required for Poppet Valve Seal Installation)

1Motor Starter/Contactor

(Combustion Blower/5 HP)

N/AMotor Starter/Contactor

(*Main Blower – if unit does not have VFD)

Filter (4” x 24” x 24”)

 

As we approach the completion of our latest project with Ship & Shore, I wanted to express my sincere appreciation to you and your entire organization for another job well done. From engineering, to fabrication, delivery and installation, along with the technical support provided throughout the project, your team excelled in all areas.

Kent Sibley
Vice President, Foam Fabricators

Process Analysis

Request a Quote